0000020949 00000 n
0000030449 00000 n
0000030918 00000 n
0000029639 00000 n
0000039132 00000 n
nhbc spandrel panel technical guidance. 0000050271 00000 n
0000008257 00000 n
Paul Cribbens, NHBC Standards Manager, said of the new guidance: As the housebuilding industry moves evermore towards innovative methods of construction, it is encouraging to see the supply chain embracing the challenges and ensuring that products perform as expected. Identification of 'coastal' sites Identification of more exposed 'coastal' sites is not as straightforward as it might seem. 0000032457 00000 n
0000031688 00000 n
Includes:Articles onbasements and waterproofingand details of the updatedCode of Practice (CoP)on 'The Definition of Waste'. 0000015504 00000 n
Spandrel panels should be suitably designed to transmit the loads to the roof . 0000037982 00000 n
0000039430 00000 n
0000002216 00000 n
0000034089 00000 n
The TRA and NHBC will also be providing further updates on gable detailing later this year. NHBCs registered address is NHBC House, Davy Avenue, Issues to be taken into account include: position ties for partial fill insulation. nhbc spandrel panel technical guidance . NHBC TECHNICAL GUIDANCE 2018 - Spandrel Panels to Cold Roofs Click here to access the document in full. 6.1.18 Wall ties - NHBC Standards 2021 NHBC Standards 2021 External masonry walls 6.1 6.1.18 Wall ties Wall ties of the correct type shall be installed where required, and be suitable for their intended use and location. NHBC TECHNICAL GUIDANCE - Spandrel Panels to Cold Roofs Click here to access the document in full. 0000001356 00000 n
Is standard bracing acceptable? Curtain walling and cladding systems that do not conform to the descriptions in this chapter will not generally be acceptable.
PDF How to build compliant SPANDREL PANELS Definition: Spandrel and infill panels to window, door and curtain wall systems.
National House-Building Council (NHBC) is authorised by the Prudential Regulation As well as the latest technical information, Technical Extra will, where relevant, tell you what actions you need to take and by when. 0000016023 00000 n
0000047477 00000 n
0000036758 00000 n
of UK financial services regulation. Weathering details and fixings, 2.1 The Standards and Technical Requirements, 3.2.6 Rendering, plastering and screeding, 3.3 Timber preservation (natural solid timber), 4.1 Land quality managing ground conditions, 4.1.2 Initial Assessment desk study (all sites), 4.1.3 Initial Assessment walkover survey (all sites), 4.1.5 Basic Investigation (sites where hazards are not identified or suspected), 4.1.6 Detailed Investigation (sites where hazards are identified or suspected), 4.1.7 Managing the risks (sites where hazards are found), 4.2.4 The effects of trees on shrinkable soils, 4.2.8 Design and construction of foundations in shrinkable soils, 4.2.9 Foundation depths for specific conditions in shrinkable soils, 4.3.8 Sloping ground and stepped foundations, 4.4 Raft, pile, pier and beam foundations, 4.5 Vibratory ground improvement techniques, 4.5.4 Confirmation of suitability for treatment, 4.5.6 Compatibility of the ground, design and treatment, 4.5.12 Verification of completed treatment, 5 Substructure, Ground Floors, Drainage and Basements, 5.1 Substructure and ground-bearing floors, 5.1.18 Laying the ground-bearing floor slab, 5.2.7 Construction of suspended concrete ground floors, 5.2.9 Thermal insulation and cold bridging, 5.3.7 Design to avoid damage and blockages, 5.4 Waterproofing of basements and other below ground structures, 6.1.20 Protection of the works during construction, 6.3.3 Supporting load-bearing internal walls, 6.3.8 Partitions: internal non load-bearing, 6.3.10 Construction of steel framed partitions, 6.3.11 Construction of proprietary systems, 6.4.6 In-situ concrete floors and concreting, 6.4.11 Joists supported by intermediate walls, 6.4.20 Floating floors or floors between homes, 6.6.12 Staircases made from timber and wood-based products, 6.8.3 Solid fuel fireplaces and hearths, 6.9.11 Electrical continuity and earth bonding, 6.9.19 Insulated render and brick slip cladding, 6.10.4 Structural design of load-bearing floors and walls, 6.10.10 Construction of load-bearing walls and external infill walls, 6.10.12 Fixing floor decking and ceilings, 6.10.20 Cladding, lining and sheathing boards, 7.1.4 Flat roof, terrace and balcony general design, 7.1.6 Flat roof, terrace and balcony structural design, 7.1.9 Profiled self-supporting metal decks, 7.1.10 Profiled self-supporting metal roofing, 7.1.11 Thermal insulation and vapour control, 7.1.12 Waterproofing layer and surface treatments, 7.1.13 Green and biodiverse (brown roofs) including roof gardens, 7.1.17 Accessible thresholds and upstands, 7.1.18 Parapets and guarding to terraces and balconies, 7.2.10 Strutting for attic trusses and cut roofs that form a floor, 7.2.15 Ventilation, vapour control and insulation, 8.1.7 Electrical services and installations, 8.2.11 Electrical installation requirements, 8.2.12 Pipes, insulation and protection from cold, 8.3 Mechanical ventilation with heat recovery, 9.1.7 Ceramic, concrete, terrazzo and similar tile finishes, 9.3.5 Ceramic, concrete, terrazzo and similar tile finishes, 9.4.3 General provisions cupboards and fitments, 9.4.6 Airing cupboards, cupboards, worktops and fitments, 9.4.7 Ironmongery, prefabricated items and other materials, 9.5.4 Conditions for painting and decorating, 10.1.10 Permanent prefabricated garages and carports, 10.2.4 Freestanding walls and retaining structures, 10.2.8 Garden areas within 3m of the home. 0000012481 00000 n
Regulation Authority in respect of carrying on its insurance business and its
7.2.24 Spandrel panels - NHBC Standards 2021 NHBC Standards 2021 Important new roofing guidance endorsed by the NHBC has been published by the Trussed Rafter Association (TRA), designed to reduce the risks, costs and waste. 0000008836 00000 n
0000029561 00000 n
0000073696 00000 n
hb```f`Z rAb,l,L@pDY}![l//? @5/"! Home. 0000023888 00000 n New . #D=1Hz}geYlMMM-cm(((vRh?> Sh.j9DCn@I3HQ gHP*)5#`'UFZ4y(["Na*S8TP%h 0000037513 00000 n
0000024144 00000 n
0000033325 00000 n
As well as the latest technical information, Technical Extra will, where relevant, tell you what actions you need to take and by when. 0000022231 00000 n
Fermacell - Fermacell Single Skin Solutions installation guidance. 2.1 The Standards and Technical Requirements 2.2 Models3 General 3.1 Concrete and its reinforcement 3.1.1 Compliance 3.1.2 Provision information 3.1.3 Storage materials 3.1.4 Site mixed concrete 3.1.5 Ready mixed concrete 3.1.6 Concrete specification 3.1.7 Admixtures 3.1.8. 0000033402 00000 n
We produce Technical Extra to provide you with detailed updates to NHBC Standards, Building Regulations compliance and current best practice guidance. 0000030146 00000 n
0000032641 00000 n
(PDF) Spandrel panels FINAL - 04.01 - NHBC - PDFSLIDE.NET The revised Chapter came into force for all new homes with foundations concreted on or after 1 January 2012. Click here to access the document in full. H\@}.
6 key features required for a compliant Spandrel Panel Weathering details and fixings, 2.1 The Standards and Technical Requirements, 3.2.6 Rendering, plastering and screeding, 3.3 Timber preservation (natural solid timber), 4.1 Land quality managing ground conditions, 4.1.2 Initial Assessment desk study (all sites), 4.1.3 Initial Assessment walkover survey (all sites), 4.1.5 Basic Investigation (sites where hazards are not identified or suspected), 4.1.6 Detailed Investigation (sites where hazards are identified or suspected), 4.1.7 Managing the risks (sites where hazards are found), 4.2.4 The effects of trees on shrinkable soils, 4.2.8 Design and construction of foundations in shrinkable soils, 4.2.9 Foundation depths for specific conditions in shrinkable soils, 4.3.8 Sloping ground and stepped foundations, 4.4 Raft, pile, pier and beam foundations, 4.5 Vibratory ground improvement techniques, 4.5.4 Confirmation of suitability for treatment, 4.5.6 Compatibility of the ground, design and treatment, 4.5.12 Verification of completed treatment, 5 Substructure, Ground Floors, Drainage and Basements, 5.1 Substructure and ground-bearing floors, 5.1.18 Laying the ground-bearing floor slab, 5.2.7 Construction of suspended concrete ground floors, 5.2.9 Thermal insulation and cold bridging, 5.3.7 Design to avoid damage and blockages, 5.4 Waterproofing of basements and other below ground structures, 6.1.18 Wall ties and bed joint reinforcements, 6.1.20 Protection of the works during construction, 6.3.3 Supporting load-bearing internal walls, 6.3.8 Partitions: internal non load-bearing, 6.3.10 Construction of steel framed partitions, 6.3.11 Construction of proprietary systems, 6.4.6 In-situ concrete floors and concreting, 6.4.11 Joists supported by intermediate walls, 6.4.20 Floating floors or floors between homes, 6.6.12 Staircases made from timber and wood-based products, 6.8.3 Solid fuel fireplaces and hearths, 6.9.11 Electrical continuity and earth bonding, 6.9.19 Insulated render and brick slip cladding, 6.10.4 Structural design of load-bearing floors and walls, 6.10.10 Construction of load-bearing walls and external infill walls, 6.10.12 Fixing floor decking and ceilings, 6.10.20 Cladding, lining and sheathing boards, 7.1.3 Flat roof, terrace and balcony general design, 7.1.5 Flat roof, terrace and balcony structural design, 7.1.8 Profiled self-supporting metal decks, 7.1.9 Profiled self-supporting metal roofing, 7.1.10 Thermal insulation and vapour control, 7.1.11 Waterproofing layer and surface treatments, 7.1.12 Green and biodiverse (brown roofs) including roof gardens, 7.1.16 Accessible thresholds and upstands, 7.1.17 Parapets and guarding to terraces and balconies, 7.2.10 Strutting for attic trusses and cut roofs that form a floor, 7.2.15 Ventilation, vapour control and insulation, 8.1.7 Electrical services and installations, 8.2.11 Electrical installation requirements, 8.2.12 Pipes, insulation and protection from cold, 8.3 Mechanical ventilation with heat recovery, 9.1.7 Ceramic, concrete, terrazzo and similar tile finishes, 9.3.5 Ceramic, concrete, terrazzo and similar tile finishes, 9.4.3 General provisions cupboards and fitments, 9.4.6 Airing cupboards, cupboards, worktops and fitments, 9.4.7 Ironmongery, prefabricated items and other materials, 9.5.4 Conditions for painting and decorating, 10.1.10 Permanent prefabricated garages and carports, 10.2.4 Freestanding walls and retaining structures, 10.2.8 Garden areas within 3m of the home. 0000037591 00000 n
0000017163 00000 n
0000037600 00000 n
0000021263 00000 n
For more information on our products and services, 0000036745 00000 n
A2 Fire Rated Spandrel Panels | Proteus SP | Proteus Facades Gable wall spandrel panels page 03 2 Structural considerations This guide provides information in relation to single leaf gable wall spandrel panels supported on the inner leaf of a masonry cavity gable wall.